Successful Sentinel-3A calibration at the CDN1 permanent transponder
Α successful Sentinel-3A calibration campaign was performed on Saturday 9 April 2016 at the CDN1 permanent transponder calibration site.
Sentinel-3A CDN1 callibration
The first Sentinel-3A satellite pass over the permanent “CDN1” calibration site will occur on Sunday 13th March 2016, 20:00 UTC
Sentinel-3 Altimeter Calibration
The Sentinel-3 Altimeter Calibration Site is fully operational and ready to get first signal from Sentinel-3A satellite,